Ribbon Mixer Blender for Chemical, Plastic, Food, Cosmetic Powder Mixer

Ribbon Mixer Blender for Chemical, Plastic, Food, Cosmetic Powder Mixer

Product Description Ribbon mixer with Horizontal tank , single shaft with dual spiral symmetry circle structure. The top
Basic Info
Model NO. JLD
Certification CE, ISO, CCC, API
Application Area Food
Layout Type Horizontal
Mixing Drum Shape Drum
Additional Capabilities Spray
Operating type Cycle Operating
Condition New
Loading Factor 0.5
Loading Capacity 500L
Motor Power 7.5kw
Rotating Speed ≤45 Rpm
Weight 1100kg
Max. Loading Weight 150kg
Transport Package Wooden Container
Specification 2300mm*1000mm*2000mm
Trademark JXX
Origin China
HS Code 842240000
Production Capacity 50sets/Month
Product Description

Ribbon mixer with Horizontal tank , single shaft with dual spiral symmetry circle structure.

The top cover of the U Shape tank has the entrance for material. It can be also designed with spray or add liquid device according the customer's needs. Inside the tank there equipped the axes rotor which consist of, corss support and spiral ribbon.

Under the bottom of the tank, there has a flap dome valve (pneumatic control or manual control) of the center. The valve is arc design that assure no material deposit and without no dead angle when mixing. Reliable regula- seal prohibit the leakage between the frequent close and open.

The discon-nexion ribbon of the mixer can make the material mixed with more high speed and uniformity in short time.

This mixer also can be designed with the function to keep cold or heat. Add one layer outside the tank and put into medium into the interlayer to get the mixing material cold or heat. Usually use water for cool and hot steam or use electrical for heat.


Technical Parameter
Company Show
Company introduction: Jiangsu Xingxing Drying EquipmentJiangsu Xingxing Drying Equipment has established in 1998 and it covers an area of 15000 square meters, possesses fixed asset of USD 7 million. The products have exported to US, Singapore, India, Ukraine, Russia, Korea and so on. The company have advanced production equipment , excellent technical team and after-sales service.CERTIFICATEPackage:wooden caseService:pre-sale serviceWe Invite customers to visit our company and communicate on technical requirements face to face.sale serviceResponsible for debugging the equipment according to customers' requirements of various technical data. Our engineers will train our customers about equipment features and operation key points to make sure the equipment running in the best condition.after-sale serviceWe provide installation, debugging, maintenance, training and other services; Provide relevant technical data, equipment, software and related GMP certification materials;Set up after-sales service hotline, and arrange personnel to visit customers every year to know more customer needs,like customer operation problems in the process of production equipment.quality promiseOur company promises strictly operate the ISO9001 quality system certification standards and pharmaceutical equipment GMP audit requirements,promise we provide new equipment. Advanced technology,good quality.Equipment operation safe reliable, affordable, easy to maintain.Equipment warranty period is one year,all the parts for the equipment choose well-known brand.During the warranty when equipment have problem in quality like equipment failure and damage,the company for free maintenance or replacement.We look forward to cooperating with partners from all over the world to build win-win cooperation relationship in long term. Welcome for your visiting.Previous ExhibitionFAQ:1.
Q: Please describe your warranty period. A: 15 months after the equipment is arrived at the destination port or 12 months after the installation and commissioning of the equipment, whichever comes first.2.
Q: Do you provide on-site installation and commissioning? A: Yes, we do. If on request, we'll provide the guidance of on-site installation and commissioning. Usually one mechanical engineer and one electrical engineer to assist.3.
Q: How about the cost of on-site installation and commissioning guidance? A: The cost consists of round-trip air tickets, room and board expenses, service cost (labor cost), and site transportation (or directly provided by client), which shall be paid additionally.4.
Q: Are you a factory or a trading company? A: We are a professional manufacturer. We have own factory and pilot plant for customers to do sample testing.